Before beginning installation, verify that your hardware matches the following electrical ratings:

OC1 / OC2 / OC3 (Overcurrent): Check for a motor short circuit, heavy mechanical load, or if the acceleration time (P0.11) is too short.OV1 / OV2 / OV3 (Overvoltage): Often occurs during rapid deceleration. Increase deceleration time (P0.12) or install a braking resistor.UV (Undervoltage): Check the input power supply for stability or a loose connection.OL1 / OL2 (Overload): The motor or drive is being pushed beyond its current rating. Check for mechanical jams or reduce the load.OH (Overheat): Ensure the cooling fan is running and that there is sufficient airflow around the heat sink. Safety Precautions

Model Number: CHE100-0R7G-S2Rated Power: 0.75 kW (1.0 HP)Input Voltage: Single-phase 220V AC (±15%)Output Voltage: Three-phase 0–220V ACRated Current: 4.0AControl Mode: Sensorless Vector Control (SVC) or V/f ControlProtection Rating: IP20 Installation and Environment Guidelines invt che100-0r7g-s2 manual

If the drive encounters an error, it will display a fault code on the LED screen.

To ensure the longevity of your INVT drive, the installation environment must meet specific criteria: INVT CHE100-0R7G-S2 Manual: Installation

L, N: Connect your single-phase 220V AC power supply here.U, V, W: Connect these to your three-phase motor. (Note: Never connect input power to these terminals).(+) , (-): DC bus terminals for external braking units (if required).PE: Grounding terminal. Ensure a solid connection to prevent electromagnetic interference (EMI). Control Circuit Terminals

By following this manual guide, you can ensure a stable and efficient setup for your INVT CHE100-0R7G-S2. For complex automation logic or Modbus communication setups, refer to the full manufacturer PDF for advanced parameter mapping. and Troubleshooting Guide