: Two slots for expansion boards like RS485 interfaces or clock calendars.
: Allows the operator to manually start and stop the generator using front-panel keys.
: Three-phase measurement (L1-L2/N-L3) with monitoring for min-max voltage, frequency, and phase sequence.
: The unit monitors the mains power and automatically starts the generator if it detects a failure or anomaly (voltage/frequency drops).